###
DOI:
燃气轮机技术:2021,34(2):52-54
本文二维码信息
码上扫一扫!
余热锅炉主蒸汽减温水控制策略
(中海油牟宁热电有限责任公司)
Strategy of Main Steam Desuperheating Water in Waste Heat Boiler
(CNOOC Funing Thermal Power Co. Ltd.)
摘要
图/表
参考文献
相似文献
本文已被:浏览 462次   下载 346
    
中文摘要: 阐述燃气-蒸汽联合循环运行中主蒸汽超温的过程和现象,从余热锅炉结构特点人手,详细剖析燃 气-蒸汽联合循环主蒸汽超温的原因,找到主蒸汽超温的末端影响因素。实际运行中,预知主蒸汽超温因 素,采取手动提前干预,检查扰动后主蒸汽控制线性是否达到控制预期,未达预期,重新修正提前量,直到达 到控制预期。查阅机组DCS(分散控制系统)减温水控制逻辑,修改主蒸汽控制逻辑,对于要完善减温水控制 逻辑改造的燃气电厂有借鉴意义。
Abstract:This paper describes the process and phenomenon of main steam over temperature in gas steam combined cycle operation. Starting from the structural characteristics of waste heat boiler, the causes of main steam over temperature in gas steam combined cycle are analyzed in detail, and the end influence factors of main steam over temperature are found. In the actual operation, the main steam temperature overtemperature factors are predicted in advance, and manual intervention is taken to check whether the main steam control linearity after disturbance meets the control expectation. If the control expectation is not met, the advance amount shall be revised again until the control expectation is reached. Refer to the unit distributed control system desuperheating water control logic and modify the main steam control logic. It can be used for reference for gas turbine power plant to improve desuperlieating water control logic.
文章编号:     中图分类号:TK478    文献标志码:
基金项目:
引用文本:
作者.题名[J].刊名,出版年份,卷号(期号):起止页码.
[2]KIM K M, PARK J S, DONG H L, et al. Analysis of conjugated heat transfer, stress and failure in a gas turbine blade with circular cooling passages[J]. Engineering Failure Analysis, 2011, 18(4):1212-1222.

用微信扫一扫

用微信扫一扫